|   | 
Details
   web
Record
Author (up) Jarvis, A.P.; Younger, P.L.
Title Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses Type Journal Article
Year 1999 Publication Jciwem Abbreviated Journal
Volume 13 Issue 5 Pages 313-318
Keywords Wetlands and estuaries geographical abstracts: physical geography hydrology (71 6 8) composting constructed wetland design performance assessment United Kingdom EnglandCounty Durham
Abstract Acidic spoil-heap drainage, containing elevated concentrations of iron, aluminium and manganese, has been polluting the Stanley Burn in County Durham for nearly two decades. Following the success of a pilot-scale wetland (the first application of its kind in Europe), a full-scale wetland was installed. Waste manures and composts have been used as the main substrate which is contained within embankments constructed from compacted pulverized fuel ash. The constructed wetland, which cost less than £20,000 to build, has consistently reduced iron and aluminium concentrations and has markedly lowered the acidity of the drainage. A third phase of activities at the site aims to identify and eliminate pollutant-release 'hot spots' within the spoil.
Address
Corporate Author Thesis
Publisher Place of Publication Editor
Language Summary Language Original Title
Series Editor Series Title Abbreviated Series Title
Series Volume Series Issue Edition
ISSN 0951-7359 ISBN Medium
Area Expedition Conference
Notes Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses; 2227678; United-Kingdom 9; Geobase Approved no
Call Number CBU @ c.wolke @ 17546 Serial 339
Permanent link to this record