Heal, K., Younger, P., Smith, K., Quinn, P., Glendinning, S., Aumônier, J., et al. (2004). (P. Jarvis Adam, A. Dudgeon Bruce, & L. Younger Paul, Eds.). mine water 2004 – Proceedings International Mine Water Association Symposium. 2: University of Newcastle.
|
Hellier, W. W., Giovannitti, E. F., & Slack, P. T. (1994). Best professional judgement analysis for constructed wetlands as a best available technology for the treatment of post-mining groundwater seeps. In Special Publication – United States. Bureau of Mines, Report: BUMINES-SP-06A-94 (pp. 60–69). Proceedings of the International land reclamation and mine drainage conference and Third international conference on The abatement of acidic drainage; Volume 1 of 4; Mine drainage.
|
Herbert, R. B., Jr., Benner, S. G., & Blowes, D. W. (1998). Reactive barrier treatment of groundwater contaminated by acid mine drainage; sulphur accumulation and sulphide formation. In M. Herbert, & K. Kovar (Eds.), Groundwater Quality: Remediation and Protection (pp. 451–457). IAHS-AISH Publication, vol.250.
Abstract: A permeable reactive barrier was installed in August 1995 at the Nickel Rim Mine near Sudbury, Ontario, Canada, for the passive remediation of groundwater contaminated with acid mine drainage. The reactive component of the barrier consists of a mixture of municipal and leaf compost and wood chips: the organic material promotes bacterially-mediated sulphate reduction. Hydrogen sulphide, a product of sulphate reduction, may then complex with aqueous ferrous iron and precipitate as iron sulphide. This study presents the solid phase sulphur chemistry of the reactive wall after two years of operation, and discusses the formation and accumulation of iron sulphide minerals in the reactive material. The results from the solid-phase chemical analysis of core samples indicate that there is an accumulation of reduced inorganic sulphur in the reactive wall, with levels reaching 190 mu mol g (super -1) (dry weight) by July 1997.
|
Jage, C. R., & Zipper, C. E. (2000). Acid-mine drainage treatment using successive alkalinity-producing systems. Powell River Project research and education program reports.
|
Jarvis, A. P., & Younger, P. L. (1999). Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses. Jciwem, 13(5), 313–318.
Abstract: Acidic spoil-heap drainage, containing elevated concentrations of iron, aluminium and manganese, has been polluting the Stanley Burn in County Durham for nearly two decades. Following the success of a pilot-scale wetland (the first application of its kind in Europe), a full-scale wetland was installed. Waste manures and composts have been used as the main substrate which is contained within embankments constructed from compacted pulverized fuel ash. The constructed wetland, which cost less than £20,000 to build, has consistently reduced iron and aluminium concentrations and has markedly lowered the acidity of the drainage. A third phase of activities at the site aims to identify and eliminate pollutant-release 'hot spots' within the spoil.
|