(1995). Selecting Mine Drainage Treatment Systems. E&Mj-Engineering and Mining Journal, 196(10), Rr24–&.
|
Holtzhausen, L. (2005). Minewater treatment technology revved up. Water Sewage and Effluent, 25(2), 24–26.
|
Coulton, R. H., & Williams, K. P. (2005). Active treatment of mine water; a European perspective. Mine Water Env., 24(1), 23–26.
|
Whitehead, P. G. (2005). Bioremediation of acid mine drainage: an introduction to the Wheal Jane wetlands project. Science of the Total Environment, 338(1-2), 15–21.
Abstract: Acid mine drainage (AMD) is a widespread environmental problem associated with both working and abandoned mining operations. As part of an overall strategy to determine a long-term treatment option for AMD, a pilot passive treatment plant was constructed in 1994 at Wheat Jane Mine in Cornwall, UK. The plant consists of three separate systems; each containing aerobic reed beds, anaerobic cell and rock filters, and represents the largest European experimental facility of its kind. The systems only differ by the type of pre-treatment utilised to increase the pH of the influent minewater (pH<4): lime-dosed (LD), anoxic limestone drain (ALD) and lime free (LF), which receives no form of pre-treatment. The Wheal Jane pilot plant offered a unique facility and a major research project was established to evaluate the pilot plant and study in detail the biological mechanisms and the geochemical and physical processes that control passive treatment systems. The project has led to data, knowledge, models and design criteria for the future design, planning and sustainable management of passive treatment systems. A multidisciplinary team of scientists and managers from the U.K. universities, the Environment Agency and the Mining Industry has been put together to obtain the maximum advantage from the excellent facilities facility at Wheal Jane. (C) 2004 Elseaier B.V All rights reserved.
|
Peterson, D. E., & Kindley, M. J. (1994). The Golden Cross Mine water management system. New Zealand Mining, 14, 15–21.
Abstract: Because of its location in the sensitive Coromandel Peninsula, strict water management and environmental requirements had to be met on the Golden Cross Mine Project. This led to the development of new technologies for cyanide recovery and the adoption of advanced water management and water treatment systems. This paper discusses the water management and treatment system adopted for contaminated water at Golden Cross. While permit discharge levels must be and are met for mine discharge waters, the ultimate success of the water management system is demonstrated by the results downstream; biological surveys show no changes to the resident aquatic life in the river.
|