toggle visibility Search & Display Options

Select All    Deselect All
 |   | 
Details
   print
  Record Links
Author (up) Henderson, A. url  openurl
  Title The implementation of paste fill at the Henty Gold Mine Type Journal Article
  Year 1998 Publication Minefill'98 Abbreviated Journal  
  Volume 98 Issue 1 Pages 299-304  
  Keywords mine water treatment  
  Abstract The Henty Gold Mine, located ill Western Tasmania uses innovative solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several environmental awards. Fill is required as part of the mining method to provide passive ground support, minimise rock exposure and ensure maximum recovery of the small but high-grade orebody. The use of the whole portion of leach residue in the backfill reduces the surface tailing disposal requirements. Therefore, High Density Paste Fill (HDPF) has been selected as the most appropriate fill method to meet these objectives. Additional benefits include the minimisation of excess water from fill and the subsequent need for the collection and treatment of water and slimes. There are minimal equipment requirements during placement, thereby optimising mine resources for production.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN ISBN Medium  
  Area Expedition Conference  
  Notes The implementation of paste fill at the Henty Gold Mine; Isip:000074225800048; Times Cited: 0; ISI Web of Science Approved no  
  Call Number CBU @ c.wolke @ 17142 Serial 181  
Permanent link to this record
Select All    Deselect All
 |   | 
Details
   print

Save Citations:
Export Records: