toggle visibility Search & Display Options

Select All    Deselect All
 |   | 
Details
   print
  Records Links
Author (up) openurl 
  Title World first: Full-scale BioSure plant commissioned Type Journal Article
  Year 2006 Publication Water Wheel Abbreviated Journal  
  Volume 5 Issue 3 Pages 19-21  
  Keywords Waste Management and Pollution Policy geographical abstracts: human geography environmental planning (70 11 5) wastewater waste facility mine waste gold mine sewage treatment  
  Abstract ERWAT's Ancor Wastewater Treatment Works on the Far East Rand commissioned a 10 Ml/day full-scale plant to treat toxic mine-water from the Grootvlei gold mine using primary sewage sludge. The R15-million plant is treating sulphate rich acid mine drainage using the Rhodes BioSURE Process. First, the pumped mine-water is treated at a high-density separation (HDS) plant to remove iron and condition pH levels. Then it is pumped two km via a newly-constructed 10 Ml capacity pipeline to the Ancor works. This mine-water is then mixed together with primary sewage sludge in a mixing tank from where a splitter box directs the material to eight biological sulphate reducing reactors or bioreactors. The overflow water which is rich in sulphide is pumped through the main pump station to another mixing box. Here, iron slurry is mixed with the material before it is again divided between four reactor clarifiers for sulphide removal. The overflow water, now containing reduced sulphate levels and virtually no sulphide is pumped to Ancor's biofilters for removal of remaining Chemical Oxygen Demand (COD) and ammonia following the conventional sewage treatment process for eventual release into the Blesbokspruit.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0258-2244 ISBN Medium  
  Area Expedition Conference  
  Notes Trade-; World first: Full-scale BioSure plant commissioned; 2865725; South-Africa; Geobase Approved no  
  Call Number CBU @ c.wolke @ 17495 Serial 494  
Permanent link to this record
 

 
Author (up) openurl 
  Title The BioSulphide Process to treat acid mine drainage and Anaconda tailings at Caribou Mine, New Brunswick Type RPT
  Year 2002 Publication Abbreviated Journal  
  Volume 2002-3 Issue Pages 138  
  Keywords acid mine drainage base metals bioremediation BioSulfide Process biosulfides Canada Caribou Mine copper Eastern Canada experimental studies heavy metals laboratory studies lead Maritime Provinces metal ores metals New Brunswick pollution recovery remediation sulfides tailings waste management water treatment zinc 22 Environmental geology 27A Economic geology, geology of ore deposits  
  Abstract  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Biomet Mining Corporation, R.B.C.C. Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN ISBN Medium  
  Area Expedition Conference  
  Notes The BioSulphide Process to treat acid mine drainage and Anaconda tailings at Caribou Mine, New Brunswick; 2004-045115; GeoRef; English; 1702-2649 illus. Approved no  
  Call Number CBU @ c.wolke @ 16509 Serial 495  
Permanent link to this record
 

 
Author (up) openurl 
  Title 'Green' company offers desalination technology Type Journal Article
  Year 1998 Publication Water Sewage and Effluent Abbreviated Journal  
  Volume 18 Issue 4 Pages 9-11  
  Keywords Groundwater problems and environmental effects geomechanics abstracts: excavations (77 10 10) acid mine drainage environmental effect mine drainage  
  Abstract Water and wastewater treatment activities, projects and capabilities of South African environmental engineering specialist Envig are detailed. The company, as part of the Weir Wesgarth Consortium, has pre-qualified for the major Namibian Water Supply Project, one of the largest of its kind to date in southern Africa. This project involves the desalination of seawater to meet increasing water demand and shortfalls. Envig, if awarded the contract, would be involved in construction of three or four reverse osmosis or mechanical vapour compression sea water desalination plants and associated infrastructure. The company is also involved in a mine water desalination project at the Eskom Tutuka Power Station. A reverse osmosis plant using low fouling maintenance is being installed to deal with acid mine drainage water. Details of the design and operation of this plant are given.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0257-8700 ISBN Medium  
  Area Expedition Conference  
  Notes 'Green' company offers desalination technology; 0432290; South-Africa; Geobase Approved no  
  Call Number CBU @ c.wolke @ 17548 Serial 496  
Permanent link to this record
 

 
Author (up) Adam, K. openurl 
  Title Solid wastes management in sulphide mines: From waste characterisation to safe closure of disposal sites Type Journal Article
  Year 2003 Publication Minerals and Energy Raw Materials Report Abbreviated Journal  
  Volume 18 Issue 4 Pages 25-35  
  Keywords Waste Management and Pollution Policy Pollution and waste management non radioactive geographical abstracts: human geography environmental planning (70 11 5) geological abstracts: environmental geology (72 14 2) waste disposal waste management solid waste mining industry acid mine drainage Europe Eurasia  
  Abstract Environmentally compatible Waste Management schemes employed by the European extractive industry for the development of new projects, and applied in operating sulphide mines, are presented in this study. Standard methodologies used to assess the geotechnical and geochemical properties of the solid wastes stemming from mining and processing of sulphidic metal ores are firstly given. Based on waste properties, the measures applied to ensure the environmentally safe recycling and disposal of sulphidic wastes are summarised. Emphasis is given on the novel techniques developed to effectively prevent and mitigate the acid drainage phenomenon from sulphidic mine wastes and tailings. Remediation measures taken to minimise the impact from waste disposal sites in the post-closure period are described.  
  Address K. Adam, ECHMES Ltd, Mikras Asias 40-42, Athens 11527, Greece echmes@otenet.gr  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 1404-1049 ISBN Medium  
  Area Expedition Conference  
  Notes Solid wastes management in sulphide mines: From waste characterisation to safe closure of disposal sites; 2582509; Norway 25; Geobase Approved no  
  Call Number CBU @ c.wolke @ 17510 Serial 492  
Permanent link to this record
 

 
Author (up) Ahmed, S.M. openurl 
  Title Surface chemical methods of forming hardpan in pyrrhotite tailings and prevention of the acid mine drainage Type Journal Article
  Year 1994 Publication Abbreviated Journal  
  Volume Issue Pages  
  Keywords acid mine drainage; chemical composition; experimental studies; mines; oxidation; pollution; pyrite; pyrrhotite; remediation; sulfides; tailings; waste disposal; weathering rinds 22, Environmental geology  
  Abstract  
  Address  
  Corporate Author Thesis  
  Publisher Special Publication - United States. Bureau of Mines, Report: BUMINES-SP-06B-94 Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Proceedings of the International land reclamation and mine drainage conference and Third international conference on The abatement of acidic drainage; Volume 2 of 4; Mine drainage Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN ISBN Medium  
  Area Expedition Conference  
  Notes 2007-045205; International land reclamation and mine drainage conference; International conference on The abatement of acidic drainage, Pittsburgh, PA, United States, April 24-29, 1994 References: 4; illus. incl. 1 table; GeoRef; English Approved no  
  Call Number CBU @ c.wolke @ 6593 Serial 488  
Permanent link to this record
Select All    Deselect All
 |   | 
Details
   print

Save Citations:
Export Records: