|
Zou, L. H. (2000). Sulfide precipitation flotation for treatment of acidic mine waste water. Transactions of Nonferrous Metals Society of China, 10, 106–109.
Abstract: Sulfide precipitation flotation of copper-iron-bearing acidic waste water from a large copper mine and the stimulated waste water were studied. The pH of the waste water was 2.2, with 130 mg/L Cu2+ and 500 mg/L Fe3+ (Fe2+). Results show that, when Na2S was added as precipitating agent, sodium butylxanthate as collector and at pH 2.0, the removal of copper could be as high as 99.7 % and the residual copper decreased to 0.2 mg/L, however, almost no iron was removed. When the floated solution was neutralized to pH = 8.0, more than 98 % iron was precipitated and the residual iron was less than 10 mg/L. In experiment on actual mine effluents, after the use of precipitate flotation technology to recover copper and pH neutralization to precipitate iron, the treated waste water does meet the emission standards for sewage and valuable floating copper graded 37.12%. The chemical calculation and mechanism of solution were also presented.
|
|
|
Zinck, J. M., & Aube, B. C. (2000). Optimization of lime treatment processes. CIM Bull., 93(1043), 98–105.
Abstract: Lime neutralization technology is widely used in Canada for the treatment of acid mine drainage and other acidic effluents. In many locations, improvements to the lime neutralization process are necessary to achieve a maximum level of sludge densification and stability. Conventional lime neutralization technology effectively removes dissolved metals to below regulated limits. However, the metal hydroxide and gypsum sludge generated is voluminous and often contains less than 5% solids. Despite recent improvements in the lime neutralization technology, each year, more than 6 700 000 m3 of sludge are generated by treatment facilities operated by the Canadian mining industry. Because lime neutralization is still seen as the best available approach for some sites, sludge production and stability are expected to remain as issues in the near future. Several treatment parameters significantly impact operating costs, effluent quality, sludge production and the geochemical stability of the sludge. Studies conducted both at CANMET and NTC have shown that through minor modifications to the treatment process, plant operators can experience a reduction in operating costs, volume of sludge generated, metal release to the environment and liability. This paper discusses how modifications in plant operation and design can reduce treatment costs and liability associated with lime treatment.
|
|
|
Zinck, J. (2006). Icard 2006. St. Louis: Proceedings, International Conference of Acid Rock Drainage (ICARD).
Abstract: Sludge management is an escalating concern as the inventory of sludge continues to grow through perpetual “pump and treat” of acidic waters at mine sites. Current sludge management practices, in general, are ad hoc and frequently do not adress long-term storage, and in some cases, long-term stability. While a variety of sludge disposal practices have been applied, many have not been fully investigated and monitoring data on the performance of these technologies is limited and not readily available. This paper discusses options for treatment sludge management including conventionale disposal technologies and options for reclamation of sludge areas.
|
|
|
Ziemkiewicz, P. F., Skousen, J. G., Skousen, J. G., & Ziemkiewicz, P. F. (1996). Prevention of acid mine drainage by alkaline addition. In Acid mine drainage control and treatment. Morgantown: West Virginia University and the National Mine Land Reclamation Center.
|
|
|
Ziemkiewicz, P. F., Skousen, J. G., Skousen, J. G., & Ziemkiewicz, P. F. (1996). Overview of acid mine drainage at-source control strategies. In Acid mine drainage control and treatment. Morgantown: West Virginia University and the National Mine Land Reclamation Center.
|
|