toggle visibility Search & Display Options

Select All    Deselect All
 |   | 
Details
   print
  Record Links
Author (up) Jarvis, A.P.; Younger, P.L. openurl 
  Title Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses Type Journal Article
  Year 1999 Publication Jciwem Abbreviated Journal  
  Volume 13 Issue 5 Pages 313-318  
  Keywords Wetlands and estuaries geographical abstracts: physical geography hydrology (71 6 8) composting constructed wetland design performance assessment United Kingdom EnglandCounty Durham  
  Abstract Acidic spoil-heap drainage, containing elevated concentrations of iron, aluminium and manganese, has been polluting the Stanley Burn in County Durham for nearly two decades. Following the success of a pilot-scale wetland (the first application of its kind in Europe), a full-scale wetland was installed. Waste manures and composts have been used as the main substrate which is contained within embankments constructed from compacted pulverized fuel ash. The constructed wetland, which cost less than £20,000 to build, has consistently reduced iron and aluminium concentrations and has markedly lowered the acidity of the drainage. A third phase of activities at the site aims to identify and eliminate pollutant-release 'hot spots' within the spoil.  
  Address  
  Corporate Author Thesis  
  Publisher Place of Publication Editor  
  Language Summary Language Original Title  
  Series Editor Series Title Abbreviated Series Title  
  Series Volume Series Issue Edition  
  ISSN 0951-7359 ISBN Medium  
  Area Expedition Conference  
  Notes Design, construction and performance of a full-scare compost wetland for mine-spoil drainage treatment at quaking houses; 2227678; United-Kingdom 9; Geobase Approved no  
  Call Number CBU @ c.wolke @ 17546 Serial 339  
Permanent link to this record
Select All    Deselect All
 |   | 
Details
   print

Save Citations:
Export Records: