(2006). World first: Full-scale BioSure plant commissioned. Water Wheel, 5(3), 19–21.
Abstract: ERWAT's Ancor Wastewater Treatment Works on the Far East Rand commissioned a 10 Ml/day full-scale plant to treat toxic mine-water from the Grootvlei gold mine using primary sewage sludge. The R15-million plant is treating sulphate rich acid mine drainage using the Rhodes BioSURE Process. First, the pumped mine-water is treated at a high-density separation (HDS) plant to remove iron and condition pH levels. Then it is pumped two km via a newly-constructed 10 Ml capacity pipeline to the Ancor works. This mine-water is then mixed together with primary sewage sludge in a mixing tank from where a splitter box directs the material to eight biological sulphate reducing reactors or bioreactors. The overflow water which is rich in sulphide is pumped through the main pump station to another mixing box. Here, iron slurry is mixed with the material before it is again divided between four reactor clarifiers for sulphide removal. The overflow water, now containing reduced sulphate levels and virtually no sulphide is pumped to Ancor's biofilters for removal of remaining Chemical Oxygen Demand (COD) and ammonia following the conventional sewage treatment process for eventual release into the Blesbokspruit.
|
|
|
Heal, K., Younger, P., Smith, K., Quinn, P., Glendinning, S., Aumônier, J., et al. (2004). (P. Jarvis Adam, A. Dudgeon Bruce, & L. Younger Paul, Eds.). mine water 2004 – Proceedings International Mine Water Association Symposium. 2: University of Newcastle.
|
|
|
Heal, K. V., & Salt, C. A. (1999). Treatment of acidic metal-rich drainage from reclaimed ironstone mine spoil. Water Sci. Technol., 39(12), 141–148.
Abstract: Ironstone mine spoil leaves a legacy of land contamination and diffuse water pollution with acidic, metal-rich drainage. Reclamation for woodland may exacerbate water pollution due to spoil amendment and disturbance. Constructed wetland systems (CWS) are increasingly used for treating acid mine drainage but their performance is poorly understood. A combined approach was used to reclaim the Benhar ironstone spoil heap in Central Scotland. Trees have been planted in spoil treated with dried pelleted sewage sludge, limestone and peat. Spoil drainage (pH 2.7, 247 mg l-1 total Fe) passes through a CWS. Spoil throughflow, surface water chemistry and CWS performance were monitored for 12 months after reclamation. Acidity, Fe, Mn and Al concentrations declined in throughflow after reclamation, although this effect was not uniform. Soluble reactive P has been mobilised from the sewage sludge in residual areas of spoil acidity, but losses of other nutrients were short-lived. The CWS removes on average 33 % and 20-40 % of acidity and metal inputs but removal rates decrease in winter. Spoil reclamation has been successful in enabling vegetation establishment but has also increased Fe and Mn concentrations in surface drainage from the site, even after passage through the CWS.
|
|
|
Jarvis, A. P. (2000). Design, construction and performance of passive systems for the treatment of mine and spoil heap drainage. Ph.D. thesis, University of Newcastle upon Tyne,, .
|
|
|
Mataix Gonzalez, C., & Escribano Bombin, M. (1996). Sistemas de control y tratamiento de drenajes acidos de minas. Control and treatment systems for acid mine drainage. Ingeopres, 42, 15–18.
|
|